Veteran-Owned|BBB A+ Rated|Leander, TX
Recon Roofing - Central Texas Roofing Contractor
Freshly painted Central Texas home exterior

Recon Roofing Texas

Exterior Painting

A fresh coat protects your home from the weather and makes it look new again. The prep is what makes it last.

Protection and Curb Appeal

Central Texas sun, heat, and driving rain take a toll on exterior paint. Peeling, fading, and chalking are not only cosmetic. They expose the wood and siding underneath to moisture and UV, and replacing trim costs a great deal more than painting it did. Paint is the cheapest maintenance you can do on the outside of a house.

How Often a Texas House Needs Painting

Around seven to ten years for most homes here, though south and west elevations usually fail first because they take the most sun. If you are seeing chalk on your hand when you wipe the siding, or the color has gone noticeably flat on one side of the house and not the others, you are due. Waiting past that point turns a paint job into a carpentry job.

The tell

If you get chalk on your hand when you wipe the siding, you are due. Waiting past that point turns a paint job into a carpentry job.

The Prep Is the Job

A paint job is only as good as what happens before the paint. This is where a cheap bid and a real one separate.

  • Pressure wash the whole exterior
  • Scrape loose material and sand the edges so transitions do not telegraph
  • Replace rotted trim, fascia, and soffit
  • Caulk every gap
  • Prime all bare wood

Wood Repair Before Paint

We replace rotted trim, fascia, and soffit before painting rather than caulking over it and hoping. Rot spreads, and painting over soft wood hides the problem exactly long enough for it to get worse. Since we are a roofing company, fascia and soffit are familiar territory, and we are already up there.

Paint Built for This Climate

We use exterior paints rated for UV and heat, because a product that performs fine in a milder climate will fade and chalk here. Color choice matters more than people expect too. Deep saturated colors on a south-facing wall in Central Texas fade faster than lighter ones, and we will say so before you commit to it.

Color matters more than people expect

Deep saturated colors on a south-facing wall fade faster here than lighter ones. We will say so before you commit.

What Exterior Painting Costs

Price depends on square footage, how many stories, how much prep and wood repair the house needs, and how many colors are in the scheme. A house that has been maintained costs less to paint than one that was let go, sometimes considerably. We walk the whole exterior and give you a written estimate broken out by prep, repair, and paint.

What moves the number

Square footage, stories, how many colors, and how much prep and wood repair the house needs. A maintained house costs noticeably less to paint than one that was let go.

Clean Lines and Clean Work

The finish details are what you actually look at afterward.

  • Proper masking on windows, brick, and roofing
  • Drop cloths over beds and walkways
  • Trim, doors, shutters, and garage doors included
  • Cleanup daily, not only at the end

Paint and Siding Together

If parts of your siding are past saving, replacing those sections before painting gives you a uniform surface and one finished result. It also means the new material gets primed and painted properly on all sides instead of being patched in later against a different sheen. We handle both, so it is one crew and one schedule.

Front view of a Central Texas home with completed exterior paint

What's included

  • Full exterior painting
  • Pressure washing and surface prep
  • Scrape, sand, caulk, and prime
  • Rotted trim and fascia repair
  • UV-rated exterior paint
  • Trim, doors, and shutters included
  • Daily cleanup and full masking
  • Free written estimates

Free estimate

Text us your address and we'll set up a time to take a look. No obligation.

Common Questions

How often should I paint my house in Texas?
Around seven to ten years for most homes here. South and west elevations usually fail first because they take the most sun, so it is normal for one side to need attention before the others. If you get chalk on your hand when you wipe the siding, you are due.
How long does an exterior paint job take?
Most homes run three days to a week depending on size, how many colors, and how much prep and wood repair the house needs. Prep is usually the longest part, and it is the part that determines whether the job lasts.
Do you paint during the summer?
Yes, with scheduling around the heat. Surface temperature matters more than air temperature, so we work the shaded elevations during the hottest part of the day. Paint applied to a surface that is too hot skins over before it bonds properly.
What happens if you find rotted wood?
We replace it before painting rather than caulking over it and hoping. Rot spreads, and painting over soft wood hides the problem just long enough for it to get worse. Fascia and soffit are familiar ground for us since we are a roofing company.
How long will the paint last?
Seven to ten years when the prep is done right and the product is rated for this climate. A cheap job over a chalky surface will fail in two to three no matter what the paint cost per gallon. That difference is almost entirely prep.
Do you paint trim and doors too?
Yes, trim, doors, shutters, and garage doors are part of the job rather than extras. If you want a different color on the trim than the body, that is normal and it is priced in.

This service is available across our full service area: Leander, Cedar Park, Round Rock, Georgetown, Liberty Hill, Lago Vista, Pflugerville, Austin, and surrounding Central Texas cities from Killeen to San Marcos.

View full service area